*Inspector Name:
*Organisation:
*Site Contact Details:
*Tel:
*Fax:
*Email:
*Client Name:
*Capacity:
*Date:
*Full Site Address:
Itemised list of installed air conditioning and refrigeration plant including product makes, models and identification numbers, together with cooling capacities, with locations of the indoor and outdoor components of each plant.
Yes   No   Don't know
Description of system control zones, with schematic drawings.
Yes   No   Don't know
Description of the method of control of temperature.
Yes   No   Don't know
Description of method of control of periods of operation.
Yes   No   Don't know
Floor Plans and schematics of air conditioning systems
Yes   No   Don't know
Desirable Level of Information
Reports from earlier inspections of air conditioning systems, and for the generation of an energy performance certificate.
Yes   No   Don't know
Records of maintenance operations carried out on refrigeration systems, including cleaning indoor and outdoor heat exchangers, refrigerant leakage tests, repairs to refrigeration components or replenishing with refrigerant
Yes   No   Don't know
Records of maintenance operations carried out on air delivery systems, including filter cleaning and changing, and cleaning of heat exchangers
Yes   No   Don't know
Record of calibration and maintenance operations carried out on control systems and sensors, or BMS system & sensors.
Yes   No   Don't know
Records of sub metered air conditioning plant use or energy consumption.
Yes   No   Don't know
For relevant air supply and extract systems, commissioning results of measured absorbed power at normal air delivery and extract rates and commissioning results for normal delivered delivery and extract airflow rates (or independently calculated specific fan power of the systems.)
Yes   No   Don't know
Optional Level of Information
An estimate of the design cooling load for each system (if available). Otherwise, a brief description of the occupation of the cooled spaces, and of power consuming equipment normally used in those spaces.
Yes   No   Don't know
Records of any issues or complaints that have been raised concerning the indoor comfort conditions achieved in the treated spaces.
Yes   No   Don't know
Where a BMS is used the manager should arrange for a short statement to be provided describing its capabilities , the plant it is connected to control, the set points for the control temperature, the frequency with which it is maintained, and the date of the last inspection & maintenance
Yes   No   Don't know
Where a monitoring station, or remote monitoring facility, is used to continually observe the performance of equipment such as chillers, the manager should arrange for a statement to be provided describing the parameters monitored, and a statement reviewing the operational efficiency of the equipment.
Yes   No   Don't know
Additional Notes:



Required fields are marked with (*). Please fill required fields.
Cancel